Building address: __________________________________________________________
Building description: ________________________________________________________
Roof construction: _________________________________________________________
Floor Construction: ________________________________________________________
Occupancy type: __________________________________________________________
Initial resources required: ___________________________________________________
Hazards to personal: _______________________________________________________
Location of water supply: ____________________________________________________
Available Flow: ____________________________________________________________
Estimated Fire Flow: _______________________________________________________
Level of involvement: 25% 50% 75% 100%
Estimated fire flow: ______ ______ ______ ______
Fire behavior prediction: ____________________________________________________
Predicted strategies: _______________________________________________________
Problems anticipated: ______________________________________________________
Standpipe: Sprinklers: Fire detection:
_________ ___________ _______________
Fire Prevention OrganizationFPT 102 - Fire Prevention and Inspection // Instructor: Kevin M. Kolb Slide #10